SSR Mining Reports Fourth Quarter and Year-End 2020 Results
FOURTH QUARTER FREE CASH FLOW OF
In 2021, we remain focused on execution and delivery with the goal of demonstrating our organic ability to sustain 700,000 to 800,000 gold-equivalent ounces of production for the next 5+ years. Our large brownfield growth and exploration pipeline will take center-stage this year as we advance projects and provide clarity on their potential scale and timelines."
(All figures are in U.S. dollars unless otherwise noted)
- Closed zero-premium merger with Alacer: On
September 16, 2020 , completed the transaction with Alacer to create a leading intermediate precious metals producer with robust margins, strong free cash flow generation and long mine lives led by a highly experienced leadership team with a track record of value creation. - Robust free cash flow: Reported fourth quarter attributable net income of
$89.0 million , or$0.41 per share, and adjusted attributable net income of$108.8 million , or$0.50 per share. Generated cash flows from operating activities of$217.4 million and free cash flow of$157.0 million in the fourth quarter.(1) - Record fourth quarter performance: Delivered fourth quarter production of 220,432 gold equivalent ounces at AISC of
$976 per gold equivalent ounce, exiting the year with strong operational momentum.(1) - Enhanced balance sheet and liquidity: Cash and cash equivalents and consolidated cash balances at year-end increased to
$860.6 million and$897.0 million , respectively, further strengthening the Company's peer-leading balance sheet.(1) Cash and cash equivalents increased by$127.1 million during the fourth quarter. - Inaugural dividend announced: The Board declared the first quarterly cash dividend of
$0.05 per share. - Delivered positive Çöpler District Master Plan studies: Released an updated NI 43-101 technical report outlining two production scenarios which demonstrate the long-term value and the significant organic growth potential of this world-class operation.
- Discovered C2 copper-gold porphyry target at Çöpler: Announced positive results from four diamond drill holes below the Çöpler pit, with all holes intersecting gold-rich copper porphyry mineralization. The C2 results are another example of the long-term potential of Çöpler.
- Çöpler contributes low-cost production: Delivered gold production of 83,029 ounces in the fourth quarter and annual production of 326,908 ounces.(2) Reported AISC of
$748 per ounce in the fourth quarter, generating robust margins.(1) - Record production at Marigold: Delivered gold production of 76,941 ounces for the fourth quarter and annual production of 234,443 ounces, marking both quarterly and annual production records for the operation.
- Marigold recognized for operator safety: The Marigold team was awarded first place by the Nevada Mining Association for safety for large metal operator in 2020.
- Steady-state production at Seabee: Produced 31,915 ounces of gold at AISC of
$787 per ounce in the fourth quarter as the mine returned to steady-state operations.(1) - Strong performance at Puna: Produced 2.2 million ounces of silver at cash costs of
$8.92 per ounce in the fourth quarter.(1) AISC of$15.90 per ounce was impacted by sales well below production due to lags as concentrate shipments resumed.(1) - Provided robust 2021 outlook: In 2021, the Company expects to produce, on a consolidated basis, 720,000 to 800,000 gold-equivalent ounces at consolidated AISC of
$1,050 to$1,110 per gold equivalent ounce.(1)
(1) SSR Mining (SSRM) reports the non-GAAP financial measures of all-in sustaining costs ("AISC") per ounce of gold, silver and gold equivalent sold, adjusted attributable net income, adjusted attributable net income per share, free cash flow and consolidated cash to manage and evaluate the Company's operating performance. See "Non-GAAP Financial Measures" in Section 13. (2) Includes full year 2020 production from Çöpler. SSR Mining (SSRM) is not entitled to the economic benefits from Çöpler prior to acquisition.
Çöpler,
(amounts presented on 100% basis)
Three months ended | Period from acquisition to | Year ended December | ||||
Operating Data | 2020 | 2020 (1) | 2020 (2) | |||
Gold produced - oxide (oz) | 21,200 | 26,458 | 87,548 | |||
Gold produced - sulfide (oz) | 61,830 | 76,158 | 239,360 | |||
Total gold produced (oz) | 83,029 | 102,616 | 326,908 | |||
Gold sold (oz) | 80,388 | 108,283 | 321,272 | |||
Ore mined - oxide (kt) | 1,354 | 1,501 | 2,823 | |||
Ore mined - sulfide (kt) | 935 | 1,034 | 2,255 | |||
Total material mined (kt) | 7,045 | 8,108 | 25,861 | |||
Waste removed (kt) | 4,756 | 5,573 | 20,783 | |||
Strip ratio | 2.1 | 2.2 | 4.1 | |||
Ore stacked - oxide (kt) | 1,292 | 1,413 | 2,841 | |||
Gold grade stacked - oxide (g/t) | 1.20 | 1.20 | 1.13 | |||
Ore processed - sulfide (kt) | 584 | 669 | 2,158 | |||
Gold grade processed - sulfide (g/t) | 3.61 | 3.62 | 3.74 | |||
Gold recovery - sulfide (%) | 90.3 | 90.1 | 90.7 | |||
Average realized gold price ($/oz sold) | $ | 1,876 | $ | 1,887 | $ | 1,763 |
Cash costs ($/oz gold sold) (3, 4) | $ | 619 | $ | 614 | $ | 625 |
AISC ($/oz gold sold) (3, 4) | $ | 748 | $ | 743 | $ | 752 |
Financial Data ($000s) | ||||||
Revenue | $ | 151,970 | $ | 205,536 | N/A | |
Production costs | $ | 79,948 | $ | 120,618 | N/A | |
Depletion and depreciation | $ | 25,158 | $ | 34,053 | N/A | |
Income from mine operations | $ | 46,864 | $ | 50,865 | N/A | |
Exploration and evaluation expenses | $ | 2,605 | $ | 3,558 | N/A | |
Capital expenditures | $ | 18,463 | $ | 22,883 | N/A |
(1) | The data presented in this column is for the period from |
(2) | The operating data presented in this column includes operating results for Çöpler for the entire year ended |
(3) | The Company reports the non-GAAP financial measures of cash costs and AISC per ounce of gold sold to manage and evaluate operating performance at Çöpler. For further information, please refer to Non-GAAP Financial Measures" in Section 13. |
(4) | Cash costs and AISC per ounce of gold sold exclude the impact of any fair value adjustment on acquired inventories as at the date of the Company's acquisition of Alacer. |
Production
During the fourth quarter of 2020, Çöpler produced 83,029 ounces of gold, which included 21,200 ounces of gold production from the Çöpler oxide plant and 61,830 ounces of gold production from the sulfide plant. Production was in line with guidance despite the impacts of COVID-19. The mine plan was revised and other actions taken to mitigate the impacts of COVID-19.
From
For the year ended
For the three months and year ended
For the three months and year ended
For the three months and year ending
Mine operator availability suffered in 2020 due to COVID-19 restrictions. The revised mine plan reduced the haulage of material to the tailings storage facility ("TSF"), stockpiling this material for 2021, and allowed for available mining resources to be focused on the Manganese pit cutback. The TSF is approximately 5 kilometers from the mine and is constructed from competent mine waste. Despite the reduced construction rate in 2020 as a result of the impacts from COVID-19, the TSF is advancing ahead of operational requirements. A mining area was also brought into production in the
For the three months and year ended
The Çöpler District Master Plan 2020 ("CDMP2020"), issued in
The flotation circuit included in the recent amendment to the Çöpler Environmental Impact Assessment application and incorporated into the CDMP2020 was approved for construction by the Board of Directors. The flotation circuit will treat a side stream from the grinding circuit, with the concentrate reporting to autoclave feed and the tails to leaching. The flotation circuit is anticipated to increase the gold and sulfur grades processed through the autoclaves (increasing autoclave and oxygen utilization), reduce unit costs, and increase total sulfide plant throughput and gold production. Overall recovery declines modestly due to lower float tails recovery. The currently-installed grinding mills have demonstrated significant latent capacity, sufficient to support an increase in sulfide plant throughput capacity up to approximately 3 million tonnes per annum. The capital cost estimate for the flotation circuit is approximately
Revenue
Revenue for the fourth quarter of 2020 was $152.0 million as 80,388 ounces of gold were sold at an average realized gold price of
Revenue for the period from
Gold ounces sold in the fourth quarter of 2020 were lower than production due to the timing of gold pours at year end. Gold ounces sold from the date of acquisition to
Operating Costs
Cash costs and AISC per ounce of gold sold are non-GAAP financial measures. Please see the discussion under "Non-GAAP Financial Measures" in Section 13.
Unit operating costs remained stable as a weaker local currency offset by the impacts associated with COVID-19. The impact of fair value adjustments on acquired inventories and mineral interests are reflected in production costs and depletion and depreciation, respectively. These impacts have been removed in the calculation of cash costs and AISC per ounce of gold sold (refer to Section 13).
In the fourth quarter of 2020, cash costs per ounce of gold sold were
In the fourth quarter of 2020, AISC per ounce of gold sold was
Marigold,
Three months ended | Year ended | |||||||||
Operating Data | 2020 | 2019 | Change | 2020 | 2019 | Change | ||||
Gold produced (oz) | 76,941 | 59,186 | 30% | 234,443 | 220,227 | 6% | ||||
Gold sold (oz) | 73,927 | 61,088 | 21% | 230,043 | 226,957 | 1% | ||||
Total material mined (kt) | 22,699 | 18,457 | 23% | 85,594 | 74,039 | 16% | ||||
Waste removed (kt) | 15,946 | 11,736 | 36% | 62,038 | 48,364 | 28% | ||||
Total ore stacked (kt) | 6,753 | 6,721 | —% | 23,556 | 25,676 | (8)% | ||||
Gold stacked grade (g/t) | 0.48 | 0.36 | 33% | 0.39 | 0.40 | (3)% | ||||
Strip ratio | 2.4 | 1.7 | 41% | 2.6 | 1.9 | 37% | ||||
Average realized gold price ($/oz sold) | $ | 1,885 | $ | 1,478 | 28% | $ | 1,783 | $ | 1,391 | 28% |
Cash costs ($/oz gold sold) (1) | $ | 838 | $ | 778 | 8% | $ | 852 | $ | 811 | 5% |
AISC ($/oz gold sold) (1) | $ | 1,070 | $ | 1,117 | (4)% | $ | 1,222 | $ | 1,034 | 18% |
Financial Data ($000s) | ||||||||||
Revenue | $ | 139,183 | $ | 90,198 | 54% | $ | 409,798 | $ | 315,320 | 30% |
Production costs | $ | 62,228 | $ | 47,472 | 31% | $ | 196,409 | $ | 183,782 | 7% |
Depletion and depreciation | $ | 15,752 | $ | 12,463 | 26% | $ | 47,844 | $ | 52,291 | (9)% |
Income from mine operations | $ | 61,203 | $ | 30,263 | 102% | $ | 165,545 | $ | 79,247 | 109% |
Exploration and evaluation expenses | $ | 427 | $ | 319 | 34% | $ | 2,462 | $ | 936 | 163% |
Capital expenditures | $ | 15,833 | $ | 20,754 | (24)% | $ | 80,161 | $ | 53,702 | 49% |
(1) | The Company reports the non-GAAP financial measures of cash costs and AISC per ounce of gold sold to manage and evaluate operating performance at Marigold. For further information, please refer to "Non-GAAP Financial Measures" in Section 13. |
Production
In the fourth quarter of 2020, 22.7 million tonnes of material were mined, a 23% increase compared to the fourth quarter of 2019. For the year ended
During the fourth quarter of 2020, 6.8 million tonnes of ore was stacked at a gold grade of 0.48 g/t. This compares to 6.7 million tonnes of ore stacked at a gold grade of 0.36 g/t in the fourth quarter of 2019. The higher grades delivered in the fourth quarter of 2020 as compared to the fourth quarter 2019 are associated with the planned mining of the higher-grade portions of Mackay 4 and Mackay 8. In the fourth quarter of 2019, mining activities focused on the lower grade portions of Mackay 5 and stripping of Mackay 4.
For the year ended
During the fourth quarter of 2020, Marigold produced a quarterly record 76,941 ounces of gold, an increase of 30% compared to the fourth quarter of 2019 and 15% higher than the previous quarterly record. Production benefited from higher grades stacked at lower lifts on the heap leach pads. A decrease in electrowinning cell inventory also contributed to ounces produced in the fourth quarter of 2020.
Annual production in 2020 of 234,443 ounces was a record for the mine's 32-year history. This was 6% higher than the 220,227 ounces of gold for the year ended
Revenue
Revenue increased by 54% to
Revenue increased by 30% for the year ended
Gold ounces sold in the fourth quarter and for the year ended
Operating Costs
Cash costs and AISC per ounce of gold sold are non-GAAP financial measures. Please see the discussion under "Non-GAAP Financial Measures" in Section 13.
Cash costs per ounce of gold sold for the fourth quarter of 2020 was
In the fourth quarter of 2020, AISC per ounce of gold sold was
AISC per ounce of gold sold for the year ended
Seabee,
Three months ended | Year ended | |||||||||
Operating Data | 2020 | 2019 | Change | 2020 | 2019 | Change | ||||
Gold produced (oz) | 31,915 | 22,069 | 45% | 81,686 | 112,137 | (27)% | ||||
Gold sold (oz) | 28,013 | 24,362 | 15% | 75,837 | 104,915 | (28)% | ||||
Total ore milled (t) | 99,487 | 87,394 | 14% | 255,178 | 344,039 | (26)% | ||||
Ore milled per day (t/day) | 1,081 | 950 | 14% | 697 | 943 | (26)% | ||||
Gold mill feed grade (g/t) | 9.85 | 7.89 | 25% | 10.10 | 9.56 | 6% | ||||
Gold recovery (%) | 98.4 | 97.9 | 1% | 98.4 | 98.2 | —% | ||||
Average realized gold price ($/oz sold) | $ | 1,877 | $ | 1,484 | 26% | $ | 1,790 | $ | 1,398 | 28% |
Cash costs ($/oz sold) (1) | $ | 531 | $ | 505 | 5% | $ | 534 | $ | 464 | 15% |
AISC ($/oz sold) (1) | $ | 787 | $ | 751 | 5% | $ | 939 | $ | 812 | 16% |
Financial Data ($000s) | ||||||||||
Revenue | $ | 52,498 | $ | 36,142 | 45% | $ | 135,230 | $ | 146,141 | (7)% |
Production costs | $ | 15,583 | $ | 12,283 | 27% | $ | 41,308 | $ | 48,470 | (15)% |
Depletion and depreciation | $ | 11,148 | $ | 10,124 | 10% | $ | 28,233 | $ | 36,368 | (22)% |
Income from mine operations | $ | 25,767 | $ | 13,735 | 88% | $ | 65,689 | $ | 61,303 | 7% |
Exploration and evaluation expenses | $ | 2,088 | $ | 1,210 | 73% | $ | 6,108 | $ | 8,770 | (30)% |
Capital expenditures | $ | 8,201 | $ | 5,946 | 38% | $ | 33,758 | $ | 33,559 | 1% |
(1) | The Company reports the non-GAAP financial measures of cash costs and AISC per ounce of gold sold to manage and evaluate operating performance at Seabee. For further information, please refer to "Non-GAAP Financial Measures" in Section 13. |
Production
In response to the COVID-19 pandemic, Seabee was voluntarily placed into temporary care and maintenance on
In
During the fourth quarter of 2020, Seabee produced 31,915 ounces of gold, a 45% increase compared to the fourth quarter of 2019, due to increases in tonnes and grade mined and milling of stockpiled ore. Mill feed grade was 9.85 g/t gold during the fourth quarter of 2020, a 25% increase compared to the fourth quarter of 2019, due to the scheduled sequencing of the mine.
For the year ended
Revenue
Revenue increased by 45% in the fourth quarter of 2020 compared to the fourth quarter of 2019 due to a 15% increase in gold ounces sold and a 26% increase in the average realized gold price.
Revenue decreased by 7% for the year ended
Gold ounces sold in the fourth quarter and for the year ended
Operating Costs
Cash costs and AISC per ounce of gold sold are non-GAAP financial measures. Please see the discussion under "Non-GAAP Financial Measures" in Section 13.
In the fourth quarter of 2020, cash costs per ounce of gold sold were
In the fourth quarter of 2020, AISC per ounce of gold sold was
For the year ended
For the year ended
Puna,
(amounts presented on 100% basis)
Three months ended | Year ended | |||||||||
Operating Data | 2020 | 2019 | Change | 2020 | 2019 | Change | ||||
Silver produced ('000 oz) | 2,165 | 2,132 | 2% | 5,581 | 7,674 | (27)% | ||||
Silver sold ('000 oz) | 1,010 | 2,584 | (61)% | 4,661 | 7,695 | (39)% | ||||
Lead produced ('000 lb) (1) | 6,529 | 7,985 | (18)% | 17,193 | 23,957 | (28)% | ||||
Lead sold ('000 lb) (1) | 3,158 | 9,371 | (66)% | 14,903 | 24,119 | (38)% | ||||
Zinc produced ('000 lb) (1) | 2,932 | 3,007 | (2)% | 6,988 | 8,392 | (17)% | ||||
Zinc sold ('000 lb) (1) | 1,898 | 3,067 | (38)% | 6,039 | 14,072 | (57)% | ||||
Total material mined (kt) | 2,750 | 3,244 | (15)% | 5,696 | 12,282 | (54)% | ||||
Waste removed (kt) | 2,440 | 2,725 | (10)% | 4,879 | 10,839 | (55)% | ||||
Strip ratio | 7.9 | 5.3 | 49% | 6.0 | 7.5 | (20)% | ||||
Ore milled (kt) | 416 | 400 | 4% | 1,118 | 1,394 | (20)% | ||||
Silver mill feed grade (g/t) | 170 | 174 | (2)% | 164 | 184 | (11)% | ||||
Lead mill feed grade (%) | 0.78 | 0.99 | (21)% | 0.77 | 0.89 | (13)% | ||||
Zinc mill feed grade (%) | 0.52 | 0.63 | (17)% | 0.51 | 0.54 | (6)% | ||||
Silver recovery (%) | 95.2 | 95.1 | —% | 94.6 | 93.2 | 2% | ||||
Lead recovery (%) | 90.8 | 91.9 | (1)% | 90.2 | 85.8 | 5% | ||||
Zinc recovery (%) | 61.4 | 54.3 | 13% | 55.5 | 49.2 | 13% | ||||
Average realized silver price ($/oz) | $ | 24.78 | $ | 17.32 | 43% | $ | 21.23 | $ | 16.26 | 31% |
Cash costs ($/oz silver sold) (2) | $ | 8.92 | $ | 8.90 | —% | $ | 11.43 | $ | 10.38 | 10% |
AISC ($/oz silver sold) (2) | $ | 15.90 | $ | 11.18 | 42% | $ | 15.22 | $ | 14.06 | 8% |
Financial Data ($000s) | ||||||||||
Revenue | $ | 27,078 | $ | 51,263 | (47)% | $ | 102,525 | $ | 145,389 | (29)% |
Production costs | $ | 11,822 | $ | 29,424 | (60)% | $ | 60,317 | $ | 97,558 | (38)% |
Depreciation and depletion | $ | 2,634 | $ | 6,924 | (62)% | $ | 15,665 | $ | 17,498 | (10)% |
Income from mine operations | $ | 12,622 | $ | 14,915 | (15)% | $ | 26,543 | $ | 30,333 | (12)% |
Exploration, evaluation and reclamation expense | $ | (2,337) | $ | 492 | (575)% | $ | (2,144) | $ | 786 | (373)% |
Capital expenditures | $ | 6,480 | $ | 5,557 | 17% | $ | 17,690 | $ | 33,819 | (48)% |
(1) | Data for lead production and sales relate only to lead in lead concentrate. Data for zinc production and sales relate only to zinc in zinc concentrate. |
(2) | The Company reports the non-GAAP financial measures of cash costs and AISC per ounce of silver sold to manage and evaluate operating performance at Puna. For further information, please refer to "Non-GAAP Financial Measures" in Section 13. |
Production
On
During the fourth quarter of 2020, Puna produced 2.2 million ounces of silver, a 2% increase compared to the fourth quarter of 2019, due to higher tonnage milled at modestly lower grades. Lead and zinc production decreased 18% and 2% respectively, due to lower base metal head grades with zinc benefiting from a significant increase in recovery due to achieving finer ore grind. Ore milled was 0.4 million tonnes, a 4% increase compared to the fourth quarter of 2019 due to an increase in throughput and shorter shutdowns for scheduled maintenance. Processed ore contained an average silver grade of 170 g/t, a 2% decrease compared to the fourth quarter of 2019, which was in-line with the mine plan. The mill averaged approximately 4,517 tonnes per day during the fourth quarter of 2020, demonstrating an improved performance on plant throughput and tailings pumping system capacity achieved through continuous improvements.
For the year ended
Revenue
Revenue decreased by 47% in the fourth quarter of 2020 compared to the fourth quarter of 2019, due to a 61% decrease in silver ounces sold, partially offset by a 43% increase in the average realized silver price. Sales in the fourth quarter and for the year ended
Revenue decreased by 29% for the year ended
Operating Costs
Cash costs and AISC per ounce of silver sold are non-GAAP financial measures. Please see the discussion under "Non-GAAP Financial Measures" in Section 13.
In the fourth quarter of 2020, cash costs per ounce of silver sold were
In the fourth quarter of 2020, AISC per ounce of silver sold was
For the year ended
For the year ended
Exploration and Development
The Company holds a portfolio of prospective exploration tenures across
Çöpler District Exploration
The Company takes a disciplined approach to exploration at the Çöpler District, optimizing the historical exploration database, remapping and reinterpreting data, and judiciously drill testing new targets.
A primary focus in the Çöpler District is to fast-track exploration of oxide ore to take advantage of spare oxide plant capacity.
The Çöpler Saddle prospect and the Ardich and Çakmaktepe deposits represent the priorities as near–mine development projects with potential to add to the Company's production profile within the next two to three years.
Çöpler (80% owned)
The operating mine is the center for district exploration activities, with established infrastructure for treating both oxide and sulfide gold ores.
Commencing in 2017, a Çöpler in–pit exploration program successfully provided additional oxide ore to the processing facilities. The in–pit exploration program is ongoing, targeting both oxide and sulfide ore. Recently, the in-pit exploration program identified the possibility of a copper-gold porphyry system below the Main pit. Designated C2, drill testing of the target commenced at the end of the second quarter of 2020 and continued through the third quarter. Initial drill results are encouraging and are described in detail below.
C2 Porphyry Copper-Gold (80% owned)
The C2 target lies directly below the Main pit of the Çöpler mine. In 2020, four diamond drill holes were completed along a line of approximately 730 meters, with all holes intersecting gold-rich copper porphyry mineralization. Chalcopyrite is visible in the drill core with mineralization starting at or close to the bottom of the currently defined Çöpler Main pit.
Some of the newly discovered porphyry intrusive has been exposed in parts of the lower benches. The porphyry has well-developed stockwork and sheeted sulfide-quartz veins. Where exposed in the pit benches, these veins are locally overprinted by thicker quartz-sericite-sulfide veins. The copper mineralization is predominantly chalcopyrite formed as disseminations in the matrix and as thin veins associated with quartz accompanied with rare molybdenite mineralization. There is elevated arsenic in some zones, but this does not seem to be directly correlated to the copper mineralization. The gold mineralization is not visible.
In 2020, the Company drilled eleven diamond core holes totaling 5,379 meters, with results of the first four holes announced in a news release dated
Significant results were returned from the initial four holes:
- CDD955 returned 0.74% CuEq(1) over 241.5 meters from 37 meters, and 0.42% CuEq(1) over 166.2 meters from 287.5 meters.
- CDD935 returned 0.86% CuEq(1) over 108.6 meters from 103.1 meters.
- CDD940 returned 0.71% CuEq(1) over 81.5 meters from 271.2 meters.
- CDD947 returned 1.14% CuEq(1) over 49.6 meters from 156.9 meters,1.20% CuEq(1) over 18.4 meters from 237.8 meters, and 0.30% CuEq(1) over 127.7 meters from 303.3 meters.
(1) | Copper equivalent calculated as CuEq = [Cu ppm + ((Au ppm*Au price(g) / Cu price(g)) /10,000)]. Based upon metal prices of |
Metallurgical test work commenced at a contract laboratory in
Ardich Gold Deposit (80% owned)
The Ardich gold deposit is six kilometers northeast of the Çöpler processing facilities and is accessible by the nearby haul road to Çakmaktepe. The deposit mostly forms a tabular flat-lying gold-rich oxide and sulfide zone at the contact between an overlying assemblage of ultramafic rocks and underlying clastic and limestone rock types. The deposit is predominantly oxide mineralization.
A total of 175 drill holes were included in the maiden Ardich Mineral Resource estimate announced
The CDMP20 includes an alternative PEA case including the development of Ardich.
Drilling continues at Ardich as the Mineral Resource remains open for expansion. Subsequent to the
Mineral Resource Estimate for the Ardich Deposit (as at the Effective Date) | ||||
Material Type | Resource Category | Tonnes (kt) | Au (g/t) | Contained Gold |
Oxide (LS+HS) | Measured | 4,707 | 1.63 | 246 |
Indicated | 12,817 | 1.62 | 666 | |
Measured + Indicated | 17,524 | 1.62 | 912 | |
Inferred | 4,713 | 1.62 | 246 | |
Sulfide | Measured | 695 | 2.56 | 57 |
Indicated | 2,231 | 3.71 | 266 | |
Measured + Indicated | 2,926 | 3.43 | 323 | |
Inferred | 782 | 4.24 | 107 | |
Total | Measured | 5,402 | 1.75 | 303 |
Indicated | 15,048 | 1.93 | 932 | |
Measured + Indicated | 20,451 | 1.88 | 1,235 | |
Inferred | 5,495 | 1.99 | 352 |
|
Çöpler Saddle (80% owned)
The Saddle prospect borders the western flank of Çöpler as a two kilometer long north-south shear zone passing through West pit.
Çakmaktepe Mine (50% owned)
Çakmaktepe lies five kilometers east of the Çöpler processing infrastructure. In 2019, Phase 1 was mined. Exploration is investigating continuity to Ardich, which is immediately adjacent to the northeast of Çakmaktepe.
The Mavialtin Porphyry Belt (50% owned by SSR Mining (SSRM))
The Mavialtin Porphyry Belt contains at least four gold-copper porphyry type exploration targets over a seven by 20 kilometer area from Çakmaktepe in the north to the deposit at Mavidere in the south. In
The exploration strategy for Mavialtin is two–fold:
- Expand the known areas of mineralization, while concurrently making new discoveries, to economically justify a stand-alone mine; and/or
- Define a
Mavialtin Complex where various smaller deposits could be processed through a central facility.
Mavialtin's developmental potential and optionality are supported by:
- Proximity to existing Çöpler operations/infrastructure;
- Near-surface nature of the mineralization;
- Length of the mineralized intercepts which indicate the potential for volume; and
- Some high-grade intercepts.
Based on the results announced in
Copper Hill Copper Exploration Prospect (50% owned)
In
Marigold Exploration
An important focus of the 2020 exploration program was to identify new Mineral Resources on 11,740 hectares of adjoining mineral tenures that were acquired between 2015 and 2019.
At Valmy, there are three historic open pits mined by previous owners between 2002 and 2005, which produced approximately 196,000 ounces of gold. The Company has been expanding Mineral Resources around these pits since acquisition in 2015.
At
At
A focus for the Company is to increase gold production at Marigold by defining Mineral Resources to support additional stand-alone heap leach facilities in the North Peak area. In 2020, Marigold tested areas south of the currently producing
The Company completed 17.6 kilometers of seismic geophysical survey in two lines; one east-west transect, crossing just south of the Basalt and Antler open pits, and a north-south line the length of the Marigold deposits and onto the
In the fourth quarter of 2020, a soil sampling program was initiated at the
For 2021, the Company is planning 71,450 meters of reverse circulation and core drilling for Mineral Resource and Mineral Reserve conversion and additions at Mackay, Valmy, New Millennium,
Canada Exploration
The Company controls two separate claim groupings in
Seabee
The Seabee mineral interests comprise 100%-owned mineral tenures that are referred to as Seabee claims and an 80% owned joint venture interest on the contiguous Fisher property. Through late 2020 and early 2021, Seabee exercised its option to acquire 80% of the Fisher property and establish a joint venture, with Seabee being the operator, to advance exploration and development. Exploration activities in 2020, particularly at Fisher and other Seabee brownfield targets, were impacted as the mine shut down and then reduced ancillary activities due to COVID-19.
At Santoy, recent exploration success on Gap Hanging Wall ("Gap HW") encouraged the Company to establish underground access to the zone on the 46 level, which is 450 meters below surface. Gap HW has excellent potential to provide additional ore feed and is approximately 220 meters in the 8A mining area's hanging wall. Sheeted quartz veins in siliceous intrusive rock host gold mineralization at Gap HW, and the metallurgy is similar to other ores from Santoy.
The first excavation in the Gap HW was completed in the fourth quarter of 2020. A total of 12,470 tonnes of mineralized material was removed, with results reconciling closely to the Company's block model estimates in this part of the orebody. In addition, the excavation provided the Company with geotechnical, structural and grade continuity determinations critical for mine design. A mobile drill rig is currently drilling tightly spaced holes into the foot wall and hanging wall of the current excavation to further determine grade continuity across the entire width of the zone and enhance future block model estimates, development drives and stope design initiatives. This program is intended to confirm structural interpretation, continuity and grades as part of the technical work to convert Mineral Resources to Mineral Reserves.
The focus of drilling efforts for the fourth quarter of 2020 remained on infill and extension drilling of the Gap HW, as well as exploring the prospective Santoy Hanging Wall (Santoy HW) target. During the fourth quarter of 2020, the Company drilled 9,606 meters underground and an additional 3,887 meters from surface for a combined total of 13,493 meters. During 2020, the Company completed 39,855 meters of drilling underground and 9,638 meters from surface for a total of 49,493 meters.
In the first quarter of 2020, brownfield exploration drilling approximately 1 kilometer south of the
The Fisher property is contiguous to Seabee claims and, in
Amisk
The Amisk property is 39,882 hectares and hosts an Indicated Mineral Resource estimate. Proterozoic volcano-sedimentary rock assemblages, prospective for both base metal massive sulfide deposits and orogenic gold deposits, underlie the area. The Company's plan for this property is to investigate its potential for lode gold mineralization on the claim's western portion. The summer field program comprised detailed mapping and prospecting of the numerous gold showings on the property.
2021 Outlook
For the full year 2021, the Company expects to produce, on a consolidated basis, 720,000 to 800,000 gold equivalent ounces from its four operating mines at consolidated AISC of
Operating Guidance (100%) (1) | Çöpler (2) | Marigold | Seabee | Puna | Other | Consolidated | |
Gold Production | koz | 310 - 340 | 235 - 265 | 95 - 105 | — | — | 640 - 710 |
Silver Production | Moz | — | — | — | 6.0 - 7.0 | — | 6.0 - 7.0 |
Gold Equivalent Production | koz | 310 - 340 | 235 - 265 | 95 - 105 | 80 - 90 | — | 720 - 800 |
Cash Cost per Ounce (3) | $/oz | 550 - 600 | 810 - 860 | 525 - 575 | 10.00 - 11.50 | — | 660 - 715 |
Sustaining Capital Expenditures (4) | $M | 52 | 53 | 11 | 19 | — | 135 |
Capitalized Stripping / | $M | 9 | 47 | 19 | 13 | — | 88 |
Sustaining Exploration | $M | 2 | 7 | 1 | 1 | — | 11 |
General & Administrative (5) | $M | — | — | — | — | 30 - 35 | 30 - 35 |
Share Based Compensation (5) | $M | — | — | — | — | 15 - 20 | 15 - 20 |
All-In Sustaining Cost per | $/oz | 760 - 810 | 1,250 - 1,290 | 860 - 910 | 16.00 - 17.50 | — | 1,050 - 1,110 |
Growth Capital Expenditures | $M | 26 | — | 7 | — | — | 33 |
Growth Exploration and Development Expenditures(6) | $M | 31 | 11 | 7 | — | 5 | 54 |
Total Growth Capital | $M | 57 | 11 | 14 | — | 5 | 87 |
(1) | Figures may not add due to rounding |
(2) | Figures are reported on a 100% basis. Çöpler is 80% owned by SSR Mining (SSRM). |
(3) | SSR Mining (SSRM) reports the non-GAAP financial measures of cash costs and AISC per ounce of gold and silver sold to manage and evaluate operating performance at Çöpler, Marigold, Seabee and Puna. Refer to Section 13 "Non-GAAP Financial Measures". |
(4) | Excludes sustaining exploration expenditures. Includes |
(5) | General and administrative expenses exclude share-based compensation, which is reported separately. |
(6) | Growth exploration and development expenditures are shown on a 100% basis, of which SSR Mining (SSRM) attributable amount totals |
(7) | All figures in U.S. dollars, unless otherwise noted. Gold equivalent figures for 2021 operating guidance are based on a gold-to-silver ratio of 76:1. Cash costs and capital expenditures guidance is based on an oil price of |
2021 Priority Operational and Development Catalysts
Çöpler:
- Flotation circuit construction, with expected ramp-up beginning mid-year 2021
- Ardich exploration and concurrent development towards first production in 2023
- C2 Porphyry copper-gold exploration and advancement, focusing on an expandable development plan
Marigold:
- Ongoing cost reduction and continuous improvement initiatives
- Oxide exploration targeting higher grades and conversion at Mackay, Valmy, New Millennium,
Trenton Canyon andBuffalo Valley - Sulfide exploration and evaluation
Seabee:
- Increase mining rates to exploit latent mill capacity
- Gap Hanging Wall Mineral Resource conversion
- Seabee and Fisher exploration and resource development
Puna:
- Continue steady state production with focus on increasing productivity
- Achieve and sustain mill throughput rates above 4,000 tonnes per day
- Implement and integrate owner-operated ore transport fleet
Free cash flow generation in 2021 is expected to be approximately 75% weighted to the second half of the year due to the timing of the ramp-up and commissioning of the flotation circuit at Çöpler, timing of capital expenditures across all sites, working capital seasonality at Seabee, and tax and royalty payments that are paid in the first half of the year.
Capital Returns
The Company's capital allocation strategy is to balance continuing investment in high-return growth, maintaining peer leading financial strength, and providing sustainable capital returns to shareholders.
In recognition of SSR Mining (SSRM)'s position as a leading and sustainable free cash flow generator in the intermediate gold sector, it is the Company's intention to return excess attributable free cash flow to shareholders through a two-tiered capital return structure. While a recurring quarterly dividend is expected to be the primary method of capital return, the Company will periodically evaluate supplementing this dividend from excess attributable free cash flow in the form of incremental dividends and/or share buyback programs.
On
Financial and Operating Highlights
A summary of the Company's consolidated financial and operating results for the three months and year ended
(in thousands of US dollars, except per share data) | Three months ended | Year ended | ||||||
2020 | 2019 | 2020 | 2019 | |||||
Financial Results | ||||||||
Revenue | $ | 370,729 | $ | 177,603 | $ | 853,089 | $ | 606,850 |
Income from mine operations | $ | 146,456 | $ | 58,913 | $ | 308,642 | $ | 170,883 |
Gross margin (2) | 40% | 33% | 36% | 28% | ||||
Operating income | $ | 120,332 | $ | 43,228 | $ | 202,713 | $ | 122,338 |
Net income | $ | 97,654 | $ | 19,479 | $ | 140,468 | $ | 55,757 |
Net income attributable to equity holders of SSR Mining (SSRM) | $ | 89,039 | $ | 19,479 | $ | 133,494 | $ | 57,315 |
Basic attributable net income per share | $ | 0.41 | $ | 0.16 | $ | 0.88 | $ | 0.47 |
Adjusted attributable net income (1) | $ | 108,813 | $ | 23,717 | $ | 213,172 | $ | 78,758 |
Adjusted basic attributable net income per share (1) | $ | 0.50 | $ | 0.19 | $ | 1.41 | $ | 0.65 |
Cash generated by operating activities | $ | 217,383 | $ | 51,917 | $ | 348,615 | $ | 145,844 |
Cash (used in) generated by investing activities | $ | (54,099) | $ | (22,303) | $ | 180,790 | $ | (130,328) |
Cash (used in) generated by financing activities | $ | (36,938) | $ | (3,536) | $ | (173,204) | $ | 68,907 |
Operating Results | ||||||||
Gold produced (oz) | 191,885 | 81,255 | 418,744 | 332,364 | ||||
Gold sold (oz) | 182,328 | 85,404 | 414,163 | 331,350 | ||||
Silver produced ('000 oz) | 2,165 | 2,132 | 5,581 | 7,674 | ||||
Silver sold ('000 oz) | 1,010 | 2,584 | 4,661 | 7,695 | ||||
Lead produced ('000 lb) (4) | 6,529 | 7,985 | 17,193 | 23,957 | ||||
Lead sold ('000 lb) (4) | 3,158 | 9,371 | 14,903 | 24,119 | ||||
Zinc produced ('000 lb) (4) | 2,932 | 3,007 | 6,988 | 8,392 | ||||
Zinc sold ('000 lb) (4) | 1,898 | 3,067 | 6,039 | 14,072 | ||||
Gold equivalent produced (oz) (5) | 220,432 | 106,205 | 484,153 | 421,828 | ||||
Gold equivalent sold (oz) (5) | 194,862 | 114,268 | 465,471 | 415,383 | ||||
Average realized gold price ($/oz sold) | $ | 1,880 | $ | 1,480 | $ | 1,812 | $ | 1,394 |
Average realized silver price ($/oz sold) | $ | 24.78 | $ | 17.32 | $ | 21.23 | $ | 16.26 |
Cash cost per gold equivalent ounce sold (1, 5) | $ | 693 | $ | 716 | $ | 759 | $ | 740 |
AISC per gold equivalent ounce sold (1, 5) | $ | 976 | $ | 1,088 | $ | 1,138 | $ | 1,087 |
Financial Position | ||||||||
Cash and cash equivalents | $ | 860,637 | $ | 503,647 | ||||
Current assets | $ | 1,424,522 | $ | 899,662 | ||||
Total assets | $ | 5,244,986 | $ | 1,750,107 | ||||
Current liabilities | $ | 248,933 | $ | 234,171 | ||||
Total liabilities | $ | 1,305,083 | $ | 616,153 | ||||
Working capital (3) | $ | 1,175,589 | $ | 665,491 |
(1) | The Company reports non-GAAP financial measures including adjusted attributable net income, adjusted basic attributable net income per share, cash costs and AISC per ounce sold to manage and evaluate its operating performance at its mines. See "Non-GAAP Financial Measures" in Section 13. |
(2) | Gross margin is defined as income from mine operations divided by revenue. |
(3) | Working capital is defined as current assets less current liabilities. |
(4) | Data for lead production and sales relate only to lead in lead concentrate. Data for zinc production and sales relate only to zinc in zinc concentrate. |
(5) | Gold equivalent ounces have been established using the average realized metal prices per ounce of precious metals sold in the period and applied to the recovered silver metal content produced by the mines. Zinc and lead production are not included in gold equivalent ounces produced. |
Management Discussion & Analysis and Conference Call
This news release should be read in conjunction with our audited Consolidated Financial Statements and our MD&A as filed with the Canadian Securities Administrators and available at www.sedar.com or our website at www.ssrmining.com.
- Conference call and webcast:
Wednesday, February 17, 2021 , at5:00 pm EST .
Toll-free in U.S. and | +1 (800) 319-4610 |
All other callers: | +1 (416) 915-3239 |
Webcast: | http://ir.ssrmining.com/investors/events |
- The conference call will be archived and available on our website. Audio replay will be available for two weeks by calling:
Toll-free in U.S. and | +1 (855) 669-9658, replay code 6092 |
All other callers: | +1 (412) 317-0088, replay code 6092 |
About SSR Mining (SSRM)
SSR Mining Inc. (SSRM) is a leading, free cash flow focused intermediate gold company with four producing assets located in the
SSR Mining Contacts:
F.
SSR Mining Inc. (SSRM)
E-Mail: invest@ssrmining.com
Phone: +1 (888) 338-0046 or +1 (604) 689-3846
To receive SSR Mining (SSRM)'s news releases by e-mail, please register using the SSR Mining (SSRM) website at www.ssrmining.com.
Cautionary Note Regarding Forward-Looking Statements
Except for statements of historical fact relating to the Company, certain statements contained in this press release constitute forward-looking information, future oriented financial information, or financial outlooks (collectively "forward-looking information") within the meaning of Canadian securities laws. Forward-looking information may be contained in this document and the Company's other public filings. Forward-looking information relates to statements concerning the Company's outlook and anticipated events or results and in some cases, can be identified by terminology such as "may", "will", "could", "should", "expect", "plan", "anticipate", "believe", "intend", "estimate", "projects", "predict", "potential", "continue" or other similar expressions concerning matters that are not historical facts.
Forward-looking information and statements in this press release are based on certain key expectations and assumptions made by the Company. Although the Company believes that the expectations and assumptions on which such forward-looking information and statements are based are reasonable, undue reliance should not be placed on the forward-looking information and statements because the Company can give no assurance that they will prove to be correct. Forward-looking information and statements are subject to various risks and uncertainties which could cause actual results and experience to differ materially from the anticipated results or expectations expressed in this press release. The key risks and uncertainties include, but are not limited to: local and global political and economic conditions; governmental and regulatory requirements and actions by governmental authorities, including changes in government policy, government ownership requirements, changes in environmental, tax and other laws or regulations and the interpretation thereof; developments with respect to the coronavirus disease 2019 ("COVID-19") pandemic, including the duration, severity and scope of the pandemic and potential impacts on mining operations; and other risk factors detailed from time to time in the Company's reports filed with the Canadian securities regulatory authorities.
Forward-looking information and statements in this press release include statements concerning, among other things: forecasts; outlook; timing of production; production, cost, operating and capital expenditure guidance; the Company's intention to return excess attributable free cash flow to shareholders; the timing and implementation of the Company's dividend policy; the granting of any supplemental dividends or the implementation of any share buyback program or other supplements to the base dividend; statements regarding plans or expectations for the declaration of future dividends and the amount thereof; future cash costs and AISC per payable ounce of gold, silver and other metals sold; the prices of gold, silver and other metals; Mineral Resources, Mineral Reserves, realization of Mineral Reserves, and the existence or realization of Mineral Resource estimates; the Company's ability to discover new areas of mineralization; the timing and extent of capital investment at the Company's operations; the timing and extent of capitalized stripping at the Company's operations; the timing of production and production levels and the results of the Company's exploration and development programs; current financial resources being sufficient to carry out plans, commitments and business requirements for the next twelve months; movements in commodity prices not impacting the value of any financial instruments; estimated production rates for gold, silver and other metals produced by the Company; the estimated cost of sustaining capital; availability of sufficient financing; receipt of regulatory approvals; the timing of studies, announcements, and analysis; the timing of construction and development of proposed mines and process facilities; ongoing or future development plans and capital replacement; estimates of expected or anticipated economic returns from the Company's mining projects, including future sales of metals, concentrate or other products produced by the Company and the timing thereof; the Company's plans and expectations for its properties and operations; and all other timing, exploration, development, operational, financial, budgetary, economic, legal, social, environmental, regulatory, and political matters that may influence or be influenced by future events or conditions.
Such forward-looking information and statements are based on a number of material factors and assumptions, including, but not limited in any manner to, those disclosed in any other of the Company's filings, and include: the inherent speculative nature of exploration results; the ability to explore; communications with local stakeholders; maintaining community and governmental relations; status of negotiations and completion of transactions, including joint ventures; weather conditions at the Company's operations; commodity prices; the ultimate determination of and realization of Mineral Reserves; existence or realization of Mineral Resources; the development approach; availability and receipt of required approvals, titles, licenses and permits; sufficient working capital to develop and operate the mines and implement development plans; access to adequate services and supplies; foreign currency exchange rates; interest rates; access to capital markets and associated cost of funds; availability of a qualified work force; ability to negotiate, finalize, and execute relevant agreements; lack of social opposition to the Company's mines or facilities; lack of legal challenges with respect to the Company's properties; the timing and amount of future production; the ability to meet production, cost, and capital expenditure targets; timing and ability to produce studies and analyses; capital and operating expenditures; economic conditions; availability of sufficient financing; the ultimate ability to mine, process, and sell mineral products on economically favorable terms; and any and all other timing, exploration, development, operational, financial, budgetary, economic, legal, social, geopolitical, regulatory and political factors that may influence future events or conditions. While the Company consider these factors and assumptions to be reasonable based on information currently available to the Company, they may prove to be incorrect.
The above list is not exhaustive of the factors that may affect any of the Company's forward-looking statements and information. You should not place undue reliance on forward-looking information and statements. Forward-looking information and statements are only predictions based on the Company's current expectations and the Company's projections about future events. Actual results may vary from such forward-looking information for a variety of reasons including, but not limited to, risks and uncertainties disclosed in the Company's filings on the Company's website at www.ssrmining.com, on SEDAR at www.sedar.com, on EDGAR at www.sec.gov and on the ASX at www.asx.com.au and other unforeseen events or circumstances. Other than as required by law, the Company does not intend, and undertake no obligation to update any forward-looking information to reflect, among other things, new information or future events.
All references to "$" in this press release are to U.S. dollars unless otherwise stated.
Qualified Persons
Except as otherwise set out herein, the scientific and technical information contained in this press release relating to Çöpler has been reviewed and approved by
Cautionary Note to U.S. Investors
This press release includes Mineral Reserves and Mineral Resources classification terms that comply with reporting standards in
Cautionary Note Regarding Non-GAAP Measures
This press release includes certain terms or performance measures commonly used in the mining industry that are not defined under International Financial Reporting Standards ("IFRS"), including free cash flow, cash costs and AISC per payable ounce of gold and silver sold, realized metal prices, earnings before interest, taxes, depreciation and amortization ("EBITDA"), adjusted attributable net income, adjusted basic attributable earnings per share, consolidated cash and consolidated net cash. Non-GAAP measures do not have any standardized meaning prescribed under IFRS and, therefore, they may not be comparable to similar measures employed by other companies. The Company believe that, in addition to conventional measures prepared in accordance with IFRS, certain investors use this information to evaluate the Company's performance. The data presented is intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. Readers should refer to the endnotes in this press release for further information regarding how the Company calculates certain of these measures. Readers should also refer to the Company's management's discussion and analysis, available under the Company's corporate profile at www.sedar.com or on the Company's website at www.ssrmining.com, under the heading "Non-GAAP Financial Measures" for a more detailed discussion of how the Company calculates such measures and a reconciliation of certain measures to GAAP terms.
View original content to download multimedia:http://www.prnewswire.com/news-releases/ssr-mining-reports-fourth-quarter-and-year-end-2020-results-301229574.html
SOURCE SSR Mining Inc. (SSRM)