Please use symbol entry at top right of page to search
|
The Czechs, who need about 7-8 million tonnes of oil
annually, take Russian oil through the Druzhba pipeline as well
as other blends through TAL, which leads from But limited TAL capacity means that the country cannot
replace Druzhba supplies completely for the time being. The
"The TAL+ modification of the pipeline will be completed in
2025 and the TAL shareholders, led by The project will cost 1.2-1.6 billion crowns (
Copyright © Reuters 2008.
All rights reserved. Republication or redistribution of Reuters content,
including by caching, framing or similar means, is expressly prohibited without
the prior written consent of Reuters. Reuters and the Reuters sphere logo are
registered trademarks and trademarks of the Reuters group of companies
around the world.
More Energy NewsSearch NewsFilter ResultsPublication DateTopicProvider
|
News, commentary and research reports are from third-party sources unaffiliated with Fidelity. Fidelity does not endorse or adopt their content. Fidelity makes no guarantees that information supplied is accurate, complete, or timely, and does not provide any warranties regarding results obtained from their use.